The Requirement
BMT delivered the Total Engineering Design and Project Management of four jetties at Van Phong Bonded Petroleum Terminal, located in Vietnam's My Giang Island, Khanh Hoa Province.
What We Delivered
Conceptual and Preliminary Design:
- Site Investigations, Bathymetric and current survey, Hydrodynamic model study, soil investigation, Environmental Data Collection, Dynamic Mooring simulation.
Detailed Engineering:
- Detailed structural calculation of dolphins;
- Platform & trestle (based on 3-dimensional analysis);
- Pile Design, Foundation Calculations including drivability;
- Construction drawings.
- Preparation of Technical Specifications, Bill of Quantities and Commercial Contract Documents based on FIDIC conditions of contract for construction of civil works;
- Evaluation of tenders, selection of Marine Contractor and contract award process;
- Site supervision and monitoring of works on site, attend to site technical problems and ensure work is executed in accordance with technical specifications, construction drawings and good engineering practice;
- Preparation of all relevant construction documents and verifying 'as built' drawing for government submission and record purpose;
- Processing contractor’s submissions for interim progress payments.
For general enquiries relating to Jetty Engineering Design and Project Management for a Petroleum Terminal, please contact Dr. Richard D. Colwill