The Requirement
BMT Asia Pacific was engaged to prepare designs to more than double the output of an existing barge loading facility. The facility handles a number of different grades of coal to deliver a specified blend to each barge.
We Delivered
- Development of concepts for the upgraded facility
- Preparation of cost estimates for selected concepts
- Assessment of site operating practices, including truck traffic
- Layout drawings for preferred options
- Detailed BOQ and estimates for overall plant design
- Detailed specifications for proprietary items required for the new work
- Detailed design and drawings of the new conveys and associated equipment and structures
- Detail design and drawings of the electrical installation for the new conveyors
- Detail design of the new site HV power distribution system
- Definition of the detailed control logic and system requirements
- Technical support during construction and commissioning
For general enquiries relating to Design Upgrade of a Blending and Barge Loading Facility, please contact Mark Yong
Contact

Mark Yong
Director - Business Development
BMT Asia Pacific
Tel: +852 2815 2221
Email
View
Download Business Card
Follow BMT